THIS WEEK
|
||
The LHS tender tank rubbed down and ready for the second coat of primer. The bunker sides were given their second coat of primer last week. Ian mixing up the primer prior to adding the catalyst.
Ian and Robin putting on the second coat of primer on the LHS tank side.
|
Iain rubbing down the RHS tank side. This side was in a worse state than the left hand side, and has required a lot more preparation. Time spent filling and rubbing down is repaid by a better finish.
|
|