The pony truck being craned into position.
|
Thanks to the extra length of track, we will be able to re-wheel the engine without having to hire a crane. |
Preparing to lift the tank.
|
Taking the strain. The tank weighs about 5 tons. |
The tank being swung into position.
|
|
Lining up the holes. This took a little while. |
Lowering the tank into position. |
Actually it's Aaron's hat.... |
Side view of tender prior to levelling of tent frame. |
Steps, sieve box and associated valves and pipework refitted. |
Miniature buffers refitted. |
View of the site showing new tender tent in the background. |
Wheels and pony truck. Thanks to James Jack for the crane hire. |